Opera Manon Lescaut in Shanghai

This summer, Rock-It Cargo Shanghai and Rock-it Cargo London provided freight forwarding services for the Royal Opera House and Shanghai Grand Theater co-production of Manon Lescaut. The production involved a total of 46,000kg of ocean freight and 853 kgs of airfreight travelling from the UK to China.

Due to port congestion, the vessel carrying the shipment departed Southampton nearly fourteen days behind schedule. In order to meet the tight load in schedule in Shanghai, the RIC team decided to meet the vessel at its first call in Hong Kong instead of waiting till the vessel arrived in Shanghai as originally planned. When the vessel arrived in port on the 23rd of August RIC arranged to have the fifteen 40’ containers be the first ones off the vessel. The team had fifteen special bonded trucks waiting at the port, which were loaded, passed through customs and inspection overnight and reloaded onto mainland Chinese chassis trucks. From there the cargo was trucked to Shanghai in time for the 25th August load in at the Shanghai Grand Theatre.

 
Recent News
Recent Press
10/13/2014
Opera Manon Lescaut in Shanghai
5/2/2014
Bahrain to join ATA Carnet System
5/1/2014
Agents represent Rock-It at Conferences
4/9/2014
Alpine Training Services Successful Ninja Warrior Competition in Bahrain
4/7/2014
Rock-It London & Germany at IAMA
3/1/2014
Rockiteers Celebrating Anniversaries
2/7/2014
Rock-it Cargo London at BVE 2014
1/17/2014
Transport of NASA Project, GPMs equipment to Japan
10/14/2013
Vote for Parnelli Awards!
9/24/2013
Visit Rock-It Cargo Large Project Division at Breakbulk Americas 2013


Previous | Next